Safe work method statements (SWMS)


Duty holders

A person conducting a business or undertaking (PCBU) carrying out any high risk work in connection with a construction project is required under the Work Health and Safety Regulation 2011 (WHS Regulation) to:
  • ensure that a safe work method statement (SWMS) is prepared before the proposed work starts
  • make arrangements to ensure that the high risk construction work is carried out in accordance with the SWMS
  • ensure that a copy of the SWMS is given to the principal contractor before the work starts
  • ensure that a SWMS is reviewed and revised if necessary
  • keep a copy of the SWMS until the high risk construction work is completed.
Ref:

https://www.worksafe.qld.gov.au/construction/health-and-wellbeing-at-work/safe-work-method-statements